Reorder point calculator
The reorder point is the stock level at which you must order again so the next delivery lands before you run out. It is lead-time demand plus safety stock — not a round number someone picked. All math runs in your browser.
Result
The URL updates as you type, so you can bookmark or share a scenario.
Why the trigger is a number, not a feeling
With 14 days of lead time and 7 days of safety stock, the trigger sits at 420 units: 280 units consumed while the order is in transit plus 140 in reserve. At 20 units a day, that is 15 days of cover.
Ordering late costs more than ordering early
A stockout costs the sale, the ranking and reviews you earned, and sometimes the customer. Extra stock costs holding — roughly 20–25% of unit cost a year once storage, capital and markdown risk are counted. On a fast mover that trade is one-sided: keep the buffer. On a slow, expensive SKU, shorten the lead time or the safety days instead of tying up cash.
When the supplier slips
If lead time drifts from 14 to 21 days, the same stock policy triggers too late — the reorder point should move to 560. Recalculate whenever a supplier, a shipping lane or a demand month changes; the point is a live number, not a setting.
The same item at different velocities
Lead time 14 days plus 7 days of safety stock, so the trigger is 21 days of sales. The faster it sells, the higher the unit trigger — and the fewer days it covers.
| Daily sales | Reorder point | At 200 units |
|---|---|---|
| 5 | 105 | 60 |
| 10 | 210 | 30 |
| 20 | 420 | 15 |
| 40 | 840 | 8 |
FAQ
What is a reorder point?
The stock level that triggers a new purchase order: average daily sales × (lead time + safety days). Order at that level and the delivery arrives as the buffer runs down.
How do I choose safety stock?
In days of sales, based on how late deliveries run and how much demand swings. Three to seven days suits stable suppliers; long ocean freight and seasonal spikes need more. The cost of the buffer is holding cost; the cost of running out is lost sales and rank.
Should in-transit stock count towards the reorder point?
No. Exclude it from units on hand — it is already ordered. Counting it hides a stockout until the shipment arrives late.
Does the reorder point include the order quantity?
No. The point is the trigger; how much you order is a separate decision (usually an economic order quantity or a supplier minimum). This calculator shows the gap to refill, which is the minimum to order.